Controlled work inside a nuclear turbine hall
NWM · Nuclear Waste Management

Every decision. Engineered to be traceable.

We combine specialist engineering, purpose-built software and quality-management systems to make complex nuclear decommissioning controlled, visible and auditable.

01Asset baseline
02Controlled workflow
03Evidence chain
04Verified closure

01 / Capabilities

One programme. Four connected disciplines.

Decommissioning performs best when engineering judgement, information and assurance operate as one system.

01

Technical expertise

Engineering support for characterisation, planning, dismantling and waste-led decision-making.

02

Digital systems

Purpose-built software that connects inventories, requirements, activities and evidence in one controlled record.

03

Systematic methods

Repeatable workflows that align scope, safety, schedule and responsibilities across long programmes.

04

Quality management

Governance and assurance structures designed for scrutiny, continuity and accountable delivery.

02 / Method

A lifecycle built around evidence.

Each phase creates the verified input for the next. Nothing disappears between strategy, field execution and final closure.

  1. 01

    Assess

    Establish the asset baseline, constraints, inventory and regulatory context.

  2. 02

    Plan

    Translate strategy into sequenced work packages, decision gates and controls.

  3. 03

    Execute

    Coordinate field activity, records, waste routes and live programme evidence.

  4. 04

    Verify

    Close the evidence chain and prepare a defensible record for final clearance.

03 / Digital systems

Operational truth, in one controlled record.

A digital backbone for assets, material, requirements, work packages and evidence — designed around the realities of decommissioning.

Programme control

Decommissioning overview

Systems aligned

Inventory records

12,480

Open work packs

42

Evidence coverage

96%

Quality actions

08

Lifecycle progressLIVE MODEL
Evidence status
Engineering Linked
Waste Linked
Quality Linked
Regulatory Linked

Illustrative software interface · figures shown are demonstrative

04 / Assurance

Quality is part of the work, not a layer around it.

Clear ownership at every decision gate
Requirements connected to execution evidence
Controlled change across long programme horizons
Reviewable records prepared for independent scrutiny

Project enquiry

Bring control and traceability to your decommissioning programme.

Share your scope, country and timeline below. Supporting documents can be attached directly.

05 / Contact

International project enquiries

Tell us about the facility, the programme stage and the regulatory context. Drawings, inventories, scopes of work and tender documents can be attached.

enquiries@cupona.se

Submitted information is used only to assess and respond to your enquiry.